Facility

Built for precision. Made for scale.

Our production infrastructure brings digital printing, technical control and coordinated product execution together in one facility.

Sorkunlu Textile factory in Denizli
320 cmMaximum print width
250,000 mMonthly capacity
4–6 weeksTypical lead time
200 mStarting MOQ / design

Production infrastructure

Our facility combines wide-width digital printing with the operational disciplines needed for repeatable textile production.

Three digital printing lines

A 320 cm line, an additional 320 cm line and a 180 cm line support varied woven textile programs and production planning.

From artwork to shipment

Design review, sampling, printing, finishing coordination, sewing and packing can be structured around the project.

Discuss your next program.

Request a Quote